![]() ![]() ![]() INFO: All forked task are completed at state init INFO: Waiting for completion all forked tasks at state init INFO: Finishing all forked tasks at state init INFO: Started executing the flow in INTERACTIVE mode However I have installed this client on 3 other dell laptops within the last three days with no issues. After the preq screen gets to 100 percent it just closes out. The same thing happens on my Dell Latitude E6150 laptop during the Client install for 11gR2 11.2.0.1. INFO: Using default Validator configured in the Action class .action.PrereqActionįINE: .Resource:Can't find resource for bundle .resource.ClientDialogLabelResID, key summary.billboardįINEST: .RoutePlan:-RoutePlan-įollowed Path : INFO: Completed validating view at state INFO: Waiting for completion of background operations INFO: All forked task are completed at state checkPrereqs INFO: Verification Result for Node:xxxxxxx INFO: Environment variable: "PATH": This test checks whether the length of the environment variable "PATH" does not exceed the recommended length. Here's a dump of the log file that is generated. As a result, it is somewhat baffling why it is crashing in this instance on this specific machine. No errors are generated in the log file, and this client installer has been deployed on multiple machines of the same configuration. However, it crashes during the prerequisite check - the bar reaches 100% and then the installer closes abruptly. I'm attempting to install Oracle 11g Client Installer on Windows Server 2008 R2. 1.7K Training / Learning / Certification.165.3K Java EE (Java Enterprise Edition).7.9K Oracle Database Express Edition (XE). ![]() 3.8K Java and JavaScript in the Database. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |